Installation of Solar Panels to east rear roof slope
The Pines Green Lane Duddington Stamford PE9 3QH
17th January 2024
T1 - Large ash tree. Crown of tree is starting to merge with the crowns of the pine in the TPO'd copse of pine. Prune back ash crown to give 1.5m clearance from pine, back to most appropriate pruning points. T2 - Small suppressed pine in decline with p
8 Mill Street Duddington Stamford PE9 3QG
21st December 2023
To re-tile leaking sections of the rear roof.
Dial House High Street Duddington Stamford PE9 3QE
30th October 2023
Proposed single storey rear extension and alterations
Dial House High Street Duddington Stamford PE9 3QE
30th October 2023
Proposed single storey rear extension and alterations
Manor Farm High Street Duddington Stamford PE9 3QE
6th September 2023
Redevelopment of Red House site including the conversion and extension to existing traditional buildings to provide two dwellinghouses and construction of five new build dwellings, along with parking facilities, landscaping and new vehicular accesses
4 Top Lodge Fineshade Corby NN17 3BB
22nd August 2023
Re-submission of NE/22/01434/FUL - Construction of two storey side extension and erection of detached garage with office above.
The Village Hall Church Lane Duddington Stamford PE9 3QF
1st August 2023
Replacement of roof tiles to the Village Hall on both sides of the pitch; Collyweston slates to be retained on the front road side; Rear elevation to be replaced with Cotswold Bradstone tiles or blue slate.
Works to mitigate water damage to the building fabric including a small-scale strip-out program only removing modern building materials.
Beaumont House High Street Duddington Stamford PE9 3QE
28th September 2022
T1 & T2 Cypress trees - to remove; T3 to T 5 Cypress trees - to remove; T6 Cedar tree - reduce spread by 1.5m to shape crown; T7 Cypress tree - to remove; T8 Blue Cedar tree - remove 4 lowest limbs
The Pines Green Lane Duddington Stamford PE9 3QH
13th April 2022
Single storey link extension; enlargement/extension to existing outbuilding to allow for conversion into habitable space; and alterations to fenestration.
Royal Oak Hotel High Street Duddington Stamford PE9 3QE
15th March 2022
Conversion of lean-to to enclosed passageway using existing canopy.
The Village Hall Church Lane Duddington Stamford PE9 3QF
2nd February 2022
Discharge of Condition pursuant to application 20/01045/FUL - Change of use from paddock and parking area to garaging and hardstanding. Condition 2. Materials
The Manor High Street Duddington Stamford PE9 3QE
20th January 2022
T1 - lime tree, to remove as it is infected with Ganoderma Applanatum.
17 Highfield Duddington Stamford PE9 3QD
18th January 2022
First floor rear extension
Yew Tree House Mill Street Duddington Northamptonshire PE9 3QQ
17th January 2022
Yew tree (y4) - crown raise 2-3 metres over the footpath and 3-4 metres over the road; Elder (e1)- to remove; Purple plum (p1)- to remove; Conifer (c1)- fell what is left standing after storm damage
The Mill Mill Street Duddington Northamptonshire PE9 3QG
1st December 2021
Installation of waterwheel in existing waterwheel pit within the mill building. Installation of generator, gearbox and associated equipment for hydro electric generation.
The Mill Mill Street Duddington Northamptonshire PE9 3QG
29th November 2021
Installation of waterwheel in existing waterwheel pit within the mill building. Installation of generator, gearbox and associated equipment for hydro electric generation.
The Mill House Mill Street Duddington Northamptonshire PE9 3QG
19th October 2021
Yew (Y1) - remove due to poor health and low amenity value. Conifer (thuja) (C1) - reduce the height between 3 and 4 metres to roughly same height as yew tree, due to size. Conifer (thuja) (C2) - reduce the height between 3 and 4 metres to roughly same hei
Church Farm 23 Mill Street Duddington Northamptonshire PE9 3QG
4th October 2021
Group of Ash (G1) - to remove
The Mill Mill Street Duddington Northamptonshire PE9 3QG
21st September 2021
Variation of condition 4 to re-word the condition to state 'Prior to the operation and generation of electricity'. Pursuant to 18/01985/FUL: Installation of waterwheel in existing waterwheel pit within the mill building. Installation of generator,